Thursday, 1 October 2009

not green atall

Consultation Summary

Download

Severn Tidal Power Phase One Consultation.pdf3.1 MB

You will need Adobe Reader to view this file Download Adobe Reader free

Each chapter of the entire Severn Tidal Power Feasibility Study Consultation can be accessed from the sidebar.

You can also download PDFs of the entire consultation and the Strategic Environmental Assessment (SEA) scoping report from the Downloads section or read the Executive Summary of the consultation on this page.

The purpose of this consultation is to seek views on:

  • The scope of the Strategic Environmental Assessment that is being carried out within the feasibility study.
  • Which of the 10 possible Severn tidal power schemes under consideration will be short-listed for detailed impact assessment during 2009.
  • How the feasibility study is being conducted, the issues it is considering and how these are being approached.

If you do not wish to respond online, please see

Featured post

More patients in Scotland given antidepressants

More patients in Scotland given antidepressants 13 October 2015   From the section Scotland Image copyright Thinkstock Image ca...